Projects
Filterable by technology and development stage reached. The miniature axis on each row shows the same sequence as the development stages page.
- Power
- 2 MW
- Capacity
- 4,472 MWh
- Grid operator
- Bayernwerk Netz
- Federal state
- Bavaria
- Technology
- Storage & solar
- Time horizon
- RtB 2027
Stage: Land- Power
- 100 kW
- Capacity
- 193.5 kWh
- Grid operator
- to follow
- Federal state
- Carinthia (AT)
- Technology
- Storage & solar
- Time horizon
- in operation since 08/2025
Stage: CODStandalone large-scale storage — structure
Structural example- Power
- to follow
- Capacity
- to follow
- Grid operator
- to follow
- Federal state
- Southern Germany
- Technology
- Battery storage
- Time horizon
- to follow
Stage: GreenfieldCo-location with existing PV — structure
Structural example- Power
- to follow
- Capacity
- to follow
- Grid operator
- to follow
- Federal state
- to follow
- Technology
- Storage & solar
- Time horizon
- to follow
Stage: GreenfieldIndustrial behind-the-meter storage — structure
Structural example- Power
- to follow
- Capacity
- to follow
- Grid operator
- to follow
- Federal state
- to follow
- Technology
- Behind the meter
- Time horizon
- to follow
Stage: Greenfield
No entry matches this selection at present.
Rows marked “structural example” are not projects; they show what an entry will look like. We do not list ventures without a secured basis — a pipeline figure that cannot be evidenced is a liability in due diligence.
Why there is little here
A developer of our size does not have a list of a hundred sites, and we do not pretend otherwise. What puts a project on this page is not intent but secured land and a verifiable procedural status.
For projects developed on behalf of or together with partners, confidentiality comes before visibility. For institutional enquiries we open the data room instead — it holds considerably more than this page.